Page 4 of 5 FirstFirst ... 2345 LastLast
Results 31 to 40 of 50
Like Tree3Likes
Discuss RE Armoured Engineer question at the Sappers forum within the The Army Rumour Service website; Well when the terrier does turn up the trojan fucked....
  1. #31
    Senior Member
    Join Date
    May 2011
    Location
    In a Dark Corner
    Posts
    493
    Well when the terrier does turn up the trojan fucked.
    We build your camps and look like tramps................


    I Like watching people

  2. #32
    Member Boanegres's Avatar
    Join Date
    Nov 2006
    Posts
    54
    Not a chance, when terrier turns up, it will be Trojans bitch!!
    The future is bright..............





    The future is Armoured

  3. #33
    Senior Member
    Join Date
    May 2011
    Location
    In a Dark Corner
    Posts
    493
    trojan with its retard arm and its spas bother titan with his broken stage 1 rams
    We build your camps and look like tramps................


    I Like watching people

  4. #34
    Member Boanegres's Avatar
    Join Date
    Nov 2006
    Posts
    54
    Both were bult by the same clowns as Terrier-so why do you think that will fair any better??

    Come the revolution i will fire python over BAE head offices then doze the rubble flat!!
    The future is bright..............





    The future is Armoured

  5. #35
    Senior Member
    Join Date
    May 2011
    Location
    In a Dark Corner
    Posts
    493
    like the idea. You need to give me 90 notice if you want some help. ALC lead times and all
    We build your camps and look like tramps................


    I Like watching people

  6. #36
    Senior Member tiny_lewis's Avatar
    Join Date
    Nov 2006
    Location
    Six inches up the arsehole of England
    Posts
    2,551
    Quote Originally Posted by Boanegres View Post
    Terrier will be the replacement CET, CET was taken out of service in 2007/08 due to reliability/spares issues

    The Corp took the gap on risk.

    Terrier is due in 15-but no, trials haven't been going well!!
    It took HOW long to realise there was a reliability issue :GRIN:
    There is no question so obviously stupid that it prevents one supposedly intelligent human from asking it of another.

    Likewise, there is no human problem that cannot be solved by the correct application of the appropriate quantity of high explosive, the suitable quantity being derived by the Formula P, where P = "plenty"

    Nobody ever imagined a bunch of Orcs would steal a database table...

  7. #37
    Senior Member The_IRON's Avatar
    Join Date
    Mar 2007
    Posts
    7,030
    Images
    2
    Quote Originally Posted by tiny_lewis View Post
    It took HOW long to realise there was a reliability issue :GRIN:
    Well they didn't take much notice of us on our Shielder Reliability trials in 1996/97 and accepted that pile of...........................
    Barclays Fantasy football Premiership ARRSE Champion 2007/2008 season.


    If Carlsberg made Fantasy league managers I would probably be the BEST MANAGER in the world.

  8. #38
    Senior Member tiny_lewis's Avatar
    Join Date
    Nov 2006
    Location
    Six inches up the arsehole of England
    Posts
    2,551
    Quote Originally Posted by Boanegres View Post
    Terrier will be the replacement CET, CET was taken out of service in 2007/08 due to reliability/spares issues.
    Flash to bang time of at least 20 years
    Attached Images Attached Images  
    There is no question so obviously stupid that it prevents one supposedly intelligent human from asking it of another.

    Likewise, there is no human problem that cannot be solved by the correct application of the appropriate quantity of high explosive, the suitable quantity being derived by the Formula P, where P = "plenty"

    Nobody ever imagined a bunch of Orcs would steal a database table...

  9. #39
    Member BingtheMing's Avatar
    Join Date
    Apr 2011
    Location
    controlling traffic on the M25 with a stop/go board
    Posts
    79
    Had a look at Terrier on Ya Tube , and IMO it looks good and anything that looks good usually is.
    When I was at the 'Beach in late 80's I was sent on a symposium ( big meeting with top brass) about the possible replacement for the Frog. At the time Warrior was coming into full service and I came up with the idea that the Frog replacement could use the same base hull as Warrior but with Sapper bits attached to it .
    Has somebody "half-inched " my idea ?
    Patience and perserverance pished a hole in a stane

  10. #40
    Senior Member tiny_lewis's Avatar
    Join Date
    Nov 2006
    Location
    Six inches up the arsehole of England
    Posts
    2,551
    Not really - you weren't the first to suggest it. It had already been considered during Warrior design, and rejected.

    My source for that is the former EinC, Maj Gen Peck, 1991. With whom I had already "raised the subject" in 1987, when he was CRE BAOR.
    There is no question so obviously stupid that it prevents one supposedly intelligent human from asking it of another.

    Likewise, there is no human problem that cannot be solved by the correct application of the appropriate quantity of high explosive, the suitable quantity being derived by the Formula P, where P = "plenty"

    Nobody ever imagined a bunch of Orcs would steal a database table...

Page 4 of 5 FirstFirst ... 2345 LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •