Discuss Builder quote - advice appreciated. at the DIY forum within the The Army Rumour Service website; Myself and Mrs Jim are getting some builders in to do some minor DIY involving ...
  1. #1
    Senior Member jim30's Avatar
    Join Date
    Oct 2005
    Location
    In rig in ISAFistan...
    Posts
    2,748

    Builder quote - advice appreciated.

    Myself and Mrs Jim are getting some builders in to do some minor DIY involving moving a loft hatch, and some general boxing in in the house. We've had three quotes, one we've discounted due to not being happy with the builder. The other two, one is quoting £240 plus materials (plus VAT?) for some vaguely defined quote, while the last gave the most detailed quote at £550 plus VAT including materials.

    We went back to the last, who was our prefered choice anyway to get some clarity on how he reached the figure - he sent an email back saying they charged competitive prices, but then four hours later we got another email saying he'd do it for £430 plus VAT (£516). This is a fairly hefty price reduction, which we're not sure whether we're comfortable with or not. If the guy can knock 20% off the price without being prompted, then was he ripping us off with the original price, or is he making savings elsewhere (e.g. using the materials spare from another job?).

    Any comments would be appreciated - the guy gets good reviews, but we're just uncomfortable at such a large reduction being applied without any negotiation at all - it doesnt feel quite right!
    Author of the 'Thin Pinstriped Line' - a blog trying to provide a professional assessment of Defence issues beyond the lurid tabloid headlines.
    A positive take on the F35 announcement - http://thinpinstripedline.blogspot.c...ouncement.html
    Does Military shipbuilding have a future in an independent Scotland? http://thinpinstripedline.blogspot.c...future-of.html

  2. #2
    Senior Member bigeye's Avatar
    Join Date
    Jul 2007
    Posts
    2,658
    Possibly he realized, on reflection, that he'd overcharged you. The fact that other quotes were less bears this out.
    Having said that if the quote was detailed presumably you can tell what aspect of the bill it was that he reduced.

    BTW If you get the Poles in don't expect much graft out of them after 14.00hrs on a Friday. Wodka time.

  3. #3
    Senior Member rockpile's Avatar
    Join Date
    Jun 2007
    Posts
    1,557
    Start again. If you don't feel comfortable with them, then you have your answer.

  4. #4
    Senior Member vinniethemanxcat's Avatar
    Join Date
    Jan 2009
    Posts
    1,665
    May be like so many since cunts like Blair screwed up our economy, he's desperate to get some work in....

    If he's VAT reg, at least he's still trying to do it the right way.

  5. #5
    Senior Member Flaggie's Avatar
    Join Date
    Mar 2006
    Posts
    1,111
    He interpreted your request for clarity as not being happy with the price. To me, a detailed quote is a good sign, as it requires a degree of effort on the part of the contractor. What impression does he make on you face-to-face? Gut feeling can be worth a lot.

  6. #6
    Senior Member Drivers_log's Avatar
    Join Date
    Aug 2009
    Posts
    914
    I have some experience in building.... well, jobbing at least.

    Here's what I'd do -

    Get 3 quotes - look for the middle one.

    With the middle one:
    First impressions count. Did he answer his phone, does he respond to email quickly, was he well turned out, all that gubbins.

    Ask to see his last similar job... a recent one. If he's experienced in his field, that shouldn't be a problem.

    If you're happy with all that, then take him on. Don't worry too much about how he arrived at his figures. That is at the end of the day, his business.

  7. #7
    Aleegee1698
    Guest
    Quote Originally Posted by jim30 View Post
    Myself and Mrs Jim are getting some builders in to do some minor DIY involving moving a loft hatch, and some general boxing in in the house. We've had three quotes, one we've discounted due to not being happy with the builder. The other two, one is quoting £240 plus materials (plus VAT?) for some vaguely defined quote, while the last gave the most detailed quote at £550 plus VAT including materials.

    We went back to the last, who was our prefered choice anyway to get some clarity on how he reached the figure - he sent an email back saying they charged competitive prices, but then four hours later we got another email saying he'd do it for £430 plus VAT (£516). This is a fairly hefty price reduction, which we're not sure whether we're comfortable with or not. If the guy can knock 20% off the price without being prompted, then was he ripping us off with the original price, or is he making savings elsewhere (e.g. using the materials spare from another job?).

    Any comments would be appreciated - the guy gets good reviews, but we're just uncomfortable at such a large reduction being applied without any negotiation at all - it doesnt feel quite right!
    What was your reply to him. Did you state that 3 were in the running? If so a reduction is a normal way to secure the work, if he s that desperate. Tradesmen often pre-calculate "top-end" so they have some play to beat the competition.

    Using materials spare from another job is not a reason to doubt his quote, he has after all paid for this material, whether or not he charged his first customer for it, you will never know, but as long as it is new/serviceable, does it matter? (I d personally do the same at a reduced rate) You need the material anyway.

    Just make sure he only gets paid for actual work done/materials delivered, only when you are both happy with it. Its not a huge summe thats gonna screw you or him, but pay him daily. He may (quite rightly) have a clause in his quote to the effect of "any unforeseen complications will be charged at blah blah per hour", so make sure you are informed of any further works by him before he carries out such.

    Edit: and make sure he does nt make the loft-hatch out of 6mm ply! I m not up on UK regs, but if your ceiling is insulated, the loft-hatch should also be insulated in itself, and around the gap between rafters/hatch.
    Last edited by Aleegee1698; 22-01-2012 at 20:25.

  8. #8
    Senior Member dingerr's Avatar
    Join Date
    May 2005
    Posts
    9,042
    Builders will always be able to buy materials far cheaper than the public. To appear competitive a builder will charge a good looking price for labour and make the difference up on the materials. Fitted kitchens are a prime example of this, firms make a fortune on the units, I had a friend fit a kitchen for £2000, which would have cost me £10,000 otherwise.

    The builder might also be providing his labour for free, some will do this on initial jobs that don't take much time in the hope they will be given more work.

    Also, he may have initial quoted you for materials then found he has sufficient laying around from finished jobs.

    Alternatively he could be cooking his books.

    From your posts I don't get the feeling you're getting ripped of, he's just trying to make a decent living and trying to match his prices appropriately to everyone else. If he comes along, does a good job and your happy with it you'll wonder what all your fretting was about.

    This is, however, only a small job. If you ever get anything bigger done that costs thousands there are lots of ways to help protect yourself, which these idiots on the likes of cowboy builders don't follow.
    Aleegee1698 likes this.
    Play Torn - the online RPG many other ARRSErs are playing. Sign up using my link (below) and you will be well looked after.

    http://www.torn.com/1537915

  9. #9
    Senior Member shortfuse's Avatar
    Join Date
    May 2004
    Posts
    3,401
    Best way to get a builder to knock 20% off his bottom line is offer him cash. - VAT is so over rated,.
    You're on thin f-ucking ice my pedigree chums, and I shall be under it when it breaks. Now, f-uck off.

  10. #10
    Senior Member jim30's Avatar
    Join Date
    Oct 2005
    Location
    In rig in ISAFistan...
    Posts
    2,748
    Thanks for all the steers - they're all very helpful. I think the concern is more from my mrs, who while she's wonderful, can err on the overcautious side at times. The guy in general seemed good, prompt email replies, good comms and a sense of clearly defined professionalism. I think we'll go with him, but wanted to get a feel for whether we were being taken for a ride, and it looks like we're not.

    Cheers all!
    Author of the 'Thin Pinstriped Line' - a blog trying to provide a professional assessment of Defence issues beyond the lurid tabloid headlines.
    A positive take on the F35 announcement - http://thinpinstripedline.blogspot.c...ouncement.html
    Does Military shipbuilding have a future in an independent Scotland? http://thinpinstripedline.blogspot.c...future-of.html

Page 1 of 2 12 LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •